Over the past decade, Technip in Norway has played a dominant role in the development of subsea oil & gas fields on the Norwegian Continental shelf. Major projects carried out by Technip in Norway are: |
![]() |
Technip in Norway will provide a contingency capability for pipeline repair work, planned maintenance, modification and subsea installation using manned or remote operated methods. This will help maintain Statoil's offshore production operations. Statoil will exclusively award diving and diver-assisted operations, either scheduled or contingency related, to Technip in Norway. A new diving support vessel, with state-of-the-art diving facilities, has been built to support the work offshore. |
![]() |
This EPCI contract included flowlines, control umbilical and structures required to tie-back the Vilje satellite to the Alvheim riser bases 20km away. Awarded in 2005, the installation work took place during 2006. |
![]() |
This EPCI contract for the Fram Øst field development included the design and supply of all the flexible risers, rigid flowlines, static and dynamic service umbilicals, installation of 2 manifolds, tie-ins, pre-commissioning and seabed intervention work in order to tie-back Fram Øst and C-West templates to the existing Troll-C platform. The installation work took place during Summer 2006. |
![]() |
The EPCI contract for the installation of the subsea system for the Alvheim field on the Norwegian Continental Shelf includes the design and supply of all line pipes, flexible pipes, umbilicals, riser bases and manifolds. The installation work took place during Summer 2006. |
![]() |
In 2003, Technip in Norway was awarded the installation contract for the infield flowlines, service lines and umbilicals at the Snøhvit field approximately 160 km offshore Norway. Offshore installation occurred in 2004 and 2005. |
![]() |
The subsea portion of the Norne Satellites project was carried out in the Summer 2005. This is the first clad pipe installed using the reel pipelay method. |
![]() |
In the Summer 2004 and 2005, Technip in Norway supplied and installed within
the framework of an EPCI contract more than 40 km of rigid flowlines
and 7 km of flexible risers for the Kristin field development project. |
![]() |
In the second half of 2004, Technip in Norway performed the engineering, procurement, construction and installation of rigid infield flowlines and initiation piles. |
![]() |
The project, completed in July 2004 three weeks ahead of schedule, covered the engineering, procurement, construction and installation of 2 rigid flowlines and an umbilical for the subsea tie-back between Oseberg Sør J-template and Oseberg Sør platform |
![]() |
The scope of work for the Fram Vest EPCI contract covered the pipeline procurement and installation of flowlines. |
![]() |
In the Summer 2003, Technip in Norway performed the installation works for the Ringhorne Jurassic EPCI contract. |